Hot rolled alloy steel bar with QT 1.6660/20NiCrMo13-4
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-12-28 08:19
-
Browse the number:
37
+
Shanghai Unite Steel Trading Co., Ltd.
- Contactaixin:
Contactaixin:
shunitesteel(Mr.)
- telephone:
-
Area:
Beijing
Address:Room 1109, Green Land International, Plaza, No.275-8 Guoding East Road, Shanghai, Shanghai, China (200433)
- Website:
+
Model Number: hot rolled steel round bar-44
Key Specifications/Special Features:
Hot rolled alloy steel bar with QT 1.6660/20NiCrMo13-41.Specification:Diameter: 10-320mmLength: as your request2.Chemical composition (%):C:0.17-0.22Si:max0.4
Mn:0.3-0.6
Ni:3-3.5
P:max0.025
S:max0.035
Cr:0.8-1.2
Mo:0.3-0.5
4.Forging:
Shafts with flanks/pipes/tubes/slugs/donuts/cubes/other shapes
5.Finished goods condition:
Hot forging/hot rolling + annealing/normalizing + tempering/quenching + tempering/any conditions based on the customer's requirement
6.Surface conditions:
Scaled (hot working finish)/ground/rough machining/fine machining/based on the customer's requirement
7.Furnaces for metallurgical processing:
Electrode arc + LF/VD/VOD/ESR/Vacuum consumable electrode.
8.Ultrasonic inspection:
100% ultrasonic inspection for any imperfections or based on the customer's requirement
Mn:0.3-0.6
Ni:3-3.5
P:max0.025
S:max0.035
Cr:0.8-1.2
Mo:0.3-0.5
4.Forging:
Shafts with flanks/pipes/tubes/slugs/donuts/cubes/other shapes
5.Finished goods condition:
Hot forging/hot rolling + annealing/normalizing + tempering/quenching + tempering/any conditions based on the customer's requirement
6.Surface conditions:
Scaled (hot working finish)/ground/rough machining/fine machining/based on the customer's requirement
7.Furnaces for metallurgical processing:
Electrode arc + LF/VD/VOD/ESR/Vacuum consumable electrode.
8.Ultrasonic inspection:
100% ultrasonic inspection for any imperfections or based on the customer's requirement
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 5 - 45 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America